 |
All
Cen-Ping manufacturing facilities are ISO9001: 2000 certified
and most of them are ISO/TS16949:
2002 certified. |
|
This guarantees that we have a consistent and effective
quality
system in place to
meet our customers' quality needs. |
|
We place great importance on defining
and
documenting these needs for each part at the beginning
of a project in order |
|
to
minimize
the learning
curve once production is underway. |
 |
Mold
and machine set-up, and operating conditions are part of
our controlled documentation
system. |
|
Manufacturing quality and inspection forms are displayed
together with
sample parts
and contain all the relevant |
|
information required for our operators and quality
inspectors to
determine part consistency and quality. |
|
We work with our customers to establish
appropriate SPC and SQC requirements. |
|
All of our parts
are inspected in-house and specifications are verified with a Coordinate Measuring
Machine (CMM). |
 |
Part
quality is very much dependent on the condition of the mold.
At the end of each run, we clean, inspect, lubricate, |
|
and spray
the mold with rust
preventative. Last shots
are retained
and inspected. |
|
If
necessary, mold repairs are initiated before
wear degenerates
into a quality issue. |
 |
Quality
issues that do arise are thoroughly investigated, documented,
and corrective actions
are initiated. |
 |
With
our rich experience in engineering and quality control, we can
assure you that we deliver the best
product at
the |
|
best
price available through international price and
manufacturing
comparison. |
 |
In addition to our own quality control procedures,
Cen-Ping arranges third party inspections
through the internationally |
|
recognized companies such as SGS,
ABS,
Lloyd's or TUV when
our customers need certification. |